I've been working on the shower stall. I sanded, cleaned up, and put in a 2 inch radius cove at the bottom. Yesterday I sanded the whole bottom to lay down the fiberglass floor only to find out I was 2 inches short on my fiberglass supply.
So .... I sanded and cut fiberglass for the second layer on the floor supports port side of the engine compartment. I need to get that section of cabin sole down so I'll have something to stand on while working on the cabin side where the portlights go. I need to do some corner repair then the entire portlight section gets a re-enforcing layer of glass. ..... lots of glass and lots of resin .... but it well greatly increase the stiffness of the catwalk deck.
No comments:
Post a Comment