06/17 -- I finished the tank bottom. Layed 5 layers of glass: 3 matte, 2 roving. I've done cleaner lay-ups, but then, I wasn't doing it up side down with my head in the bottom of a tank breathing vapors. It got a little hot and set up quicker than I expected. There are a few wrinkes, but who's going to see it anyway? Now I have to grind the lid I cut out and get it put back in place.
Thursday, June 16, 2011
Diesel Tank
Wednesday, June 8, 2011
Fwd holding tank
This week I'm working on completing the fwd bilge holding tank. This way I can fininsh the main salon floor supports and fasten down the cabin sole. Once the floor is fastened I can start with the cabin interior: galley, settees, dinette, nav station, aft berthing compartment
Thursday, May 26, 2011
aft compartment floor
The hole in the middle is where my Perkins 4-107 engine and Borg Warner 71C transmission will mount up. Crew berth one on each side.
I know .... short attention span. Look at the next post. I did complete the floor supports, I just didn't get the sole layed down.
Monday, May 23, 2011
Shower time
Friday, May 20, 2011
40 year old stantion bases
Today I bought a 12 ton hydraulic press to remove the stantions from the bases they've been in for 40 years. If I can press them out without breaking them I'll use them for the safety rails on the cabin roof. . . . . . Well, 6 of the 10 came out .... the other 4 broke. So much for using them on the cabin top. Oh well, back to my original idea of making all my won stantion bases. Fourteen for the cabin top and 18 or so for the deck, that's one every 5 ft plus the gates and pulpit and stern rail. Thirty-two in all including a couple spares. That's a lot of stantion bases !!!
Monday, May 16, 2011
Fwd Bulkheads
Friday, May 6, 2011
Skippers Stateroom
I got tired of chiseling out the old rib in the overhead. Today I fit in the supports and plywood for my berth. Layed a towel on it and laid down. .... cool .... Tomorrow I just might spend the nite on the boat. May 7th .... my first night on the boat. All that's left for the main structure is the front support. I can do that tomorrow no sweat.
Wednesday, May 4, 2011
What a stack of insulation ! ! !
I must have look pretty strange driving down the freeway with a 30 inch stack on the roof of my Jeep.
Monday, May 2, 2011
Work Progressing nicely
Picture on the right: Installing the overhead ribs. Because of curing time I only set two at at time.
Well, after hitting myself in the head with a hammer a couple days ago, OUCH, while knocking out the old overhead ribs. I installed the first overhead rib in the fwd compartment. I know ... big deal ... well, to me it means progress. I've ordered the insulation and by next week I can start putting it in the overhead between the ribs.
Wednesday, April 20, 2011
Back, finally, from my trip to the far side of the US
Finally, after 6 weeks working, traveling, visiting family, I'm finally back home working on my boat. Great trip but really long. All in all Violet and I drove through 19 states not including California. We saw the Atlantic ocean, Big Horn Sheep, Prong Horn Antelope, Elk, and lots of snow.
So .... back to work ..... I missed my boat .... where did I leave off? Where do I start? Ok, let's get on track and finish the fwd berth and head. Sorry, no pics, 'cause all I'm doing is glassing in bulkheads; they look basically the same before I start and 8 hrs later when I'm finished for the day.
So .... back to work ..... I missed my boat .... where did I leave off? Where do I start? Ok, let's get on track and finish the fwd berth and head. Sorry, no pics, 'cause all I'm doing is glassing in bulkheads; they look basically the same before I start and 8 hrs later when I'm finished for the day.